03Process

Five steps.
From spec to site.

Every Onyx Supply Co engagement runs the same disciplined sequence — specification review, value engineering, direct procurement, compliance alignment, and program-integrated delivery. The output is procurement that lands on price, on quality, and on program.

01

Step

Specification Review

Where the cost lives.

We analyse project drawings, BOQs, and finishes schedules to identify cost-saving opportunities. The output is a clear map of where structural cost reduction is available — by category, by line item, by package — without compromising design intent.

Output:Cost-opportunity report
02

Step

Value Engineering

Specification redesigned to brief.

We redesign specifications to maintain design intent while optimising cost and constructability. Material selection, fabrication method, hardware schedule, and finish detail all reviewed against the lowest-cost path to function.

Output:Value-engineered package specification
03

Step

Direct Procurement

Manufacturer relationships, factory QA.

We source directly from vetted international manufacturers with strict QA controls. Factory-stage inspection — physically present, measuring against specification, with rejection authority before container load-out — keeps quality at source.

Output:Procurement contracts and QA reports
04

Step

Compliance Alignment

AU standards, certified at source.

We ensure products meet relevant Australian standards, certification, and project requirements — NCC 2025, AS/NZS series, electrical and plumbing approvals, fire and acoustic ratings, category certifications. Cleared at the manufacturing stage, not at the wharf.

Output:Certifications and compliance documentation
05

Step

Delivery Integration

On site, on program.

We coordinate logistics, staging, and delivery aligned with your construction program. Sequenced unloading, floor-by-floor fit-out coordination, staged container schedules — the package lands when the program needs it, not before and not after.

Output:Program-integrated delivery schedule
What To Expect

Concrete
timelines.

Procurement is a calendar problem before it's a cost problem. These are the intervals we work to — measured against production reality, not best-case conditions.

Brief to procurement plan

5business days
01

From the moment we receive drawings, BOQ, or finishes schedule to a value-engineered procurement plan with line-by-line cost-opportunity analysis.

Procurement plan to order

10–14business days
02

Specification finalisation, manufacturer selection, contract terms, and forward-pricing locked in across the package.

Order to site delivery

8–12weeks
03

Production, factory-stage QA inspection, compliance certification at source, and program-integrated delivery scheduling. Scope-dependent — large packages or complex logistics may extend.

Volume program lock-in

24month forward agreements
04

For multi-development programs, master-spec procurement contracts run on 24-month forward pricing with controlled-variation flexibility.

The first week is on us. Step 01 — specification review and cost-opportunity analysis — runs without commercial commitment. You see the saving before you sign.

The Outcome

Procurement that
lands on program.

Five steps run end-to-end produce a procurement function that meets the project on three axes simultaneously — price, quality, and program. The cost saving is structural, not promotional. The compliance is documented, not assumed. The delivery is sequenced, not best-effort.

Price

Cost-engineered

Quality

Source-certified

Program

Sequenced

Ready to start a brief? Step one is on us.